Social Housing · LONDON BOROUGH OF WANDSWORTH
Social Housing Maintenance in Battersea
Pre-arranged response contractor pipeline for housing associations, local authorities, ALMOs and TMOs operating in Battersea (London Borough of Wandsworth). Awaab's Law 24-hour damp and mould response, void turnaround, reactive maintenance, Disrepair Protocol documentation and evidence-pack delivery — to UK standards, on statutory timeframes, with full audit trail.
What we deliver in Battersea
- 24-hour Awaab's Law damp and mould response (statutory compliance under Social Housing Regulation Act 2023)
- Reactive plumbing, electrical, gas, heating and joinery — same day or next day
- Void property turnaround with single SOR-coded invoice per void
- Photographic evidence packs, EXIF + geotag, Tribunal-ready
- Disrepair Protocol pre-action documentation under the Pre-Action Protocol for Housing Conditions Claims (England) 2020
- Monthly compliance reporting and median statutory-timeframe dashboard
Frequently asked questions
Do you cover Awaab's Law damp and mould response in Battersea?
Yes. We run a pre-arranged 24-hour callout pipeline across Battersea (London Borough of Wandsworth) for damp and mould reports under the Social Housing Regulation Act 2023. PCA and BDMA certified surveyors, full photographic evidence packs, statutory-timeframe tracking dashboards, and Disrepair Protocol pre-action documentation included as standard.
What SLAs do you offer housing associations?
Investigation within 24 hours of tenant report, emergency works within 24 hours of identification, significant works within 7 days — matching the statutory timeframes in regulation 5 of the implementing instrument. Median response time across our existing housing-association contracts is under 12 hours from tenant report.
What trades do you cover for void turnaround in Battersea?
Full void package: plumbing, electrical (EICR + remedials), gas safety, decoration, kitchen and bathroom refresh, flooring, lock change, and final clean. SOR-coded job tickets, single invoice per void, average turnaround 5 to 9 working days for a standard 2-bed void.
How do you handle the evidence pack?
Single PDF per job, stored against the property file: tenant-report timestamp, surveyor attendance log, hazard report under HHSRS framework, photographic evidence with EXIF and geotags, materials and work-order records, tenant-signed completion. Tribunal-ready, no extra cost.
Set up a pipeline in Battersea
Named contractor SLA · fixed evidence-pack format · monthly compliance reporting.
Discuss a pipeline arrangement